Legacy modernization, before support runs out.

For startups and SMBs: we upgrade aging Django, Python and cloud infrastructure before it falls out of support, without a risky rewrite. Tests go in first, then the upgrade, then a cutover you can roll back, with slow pages and cloud cost fixed along the way.

  • 12+years experience
  • 50+projects delivered
  • Tests before upgrades
  • You own all code & IP

An example upgrade, before and after

An example legacy upgrade of a Django product. Before: Python 3.9, Django 4.2 LTS, PostgreSQL 13, Node.js 20 and Amazon Linux 2, all past the end of security support, with 31% test coverage. Tests go in first and coverage rises to 84%. AI agents then upgrade one part at a time: Python 3.13, Django 5.2 LTS, PostgreSQL 17, Node.js 24 LTS and Amazon Linux 2023, each supported until 2028 or later. The lead engineer approves the release with a rehearsed rollback, and it ships with no downtime.
upgrade · your-app All parts supported
Tests first 84% coverage

Critical flows covered, CI blocks regressions

  1. Python 3.93.13 Supported to Oct 2029
  2. Django 4.2 LTS5.2 LTS Supported to Apr 2028
  3. PostgreSQL 1317 Supported to Nov 2029
  4. Node.js 2024 LTS Supported to Apr 2028
  5. Amazon Linux 22023 Supported to Jun 2029
Engineer approval

Approved by the lead engineer. Rollback rehearsed and on standby.

Nothing reaches production without a person signing off
✓ Shipped on supported versions
Out of support
0 parts
Test coverage
84%
Supported to
Apr 2028+
Downtime
0 min

Deadlines

Deadlines that are already here.

Most support windows for the stack Django products run on closed in 2026. Past these dates, security fixes stop, and on AWS some of them start costing extra.

All 5 of these deadlines have already passed.

Support endedEnds soon afterSafe target

Platform move

Leaving Heroku or another platform?

Moving off a platform you have outgrown follows the same path: tests first, a staged move, and a cutover you can roll back.

Cloud Migration & DevOps →

Not sure which versions you run? Paste your requirements.txt, package.json or Dockerfile into our free end-of-life checker. It runs in your browser and shows every date. Planning a Django upgrade? The Django upgrade checker lists what breaks in your code between your version and the target.

Services

Modernization & upgrade services.

From a single Django version bump to moving a whole product off an aging platform, with the test coverage that makes each step safe.

Django & Python Upgrades

Move Django 4.2 or older to 5.2 LTS and Python to a supported release, one version step at a time, fixing deprecations as we go.

  • Django 5.2 LTS and supported Python
  • Dependency and deprecation cleanup
  • Replacements for abandoned packages

Test Coverage First

Most aging codebases have thin tests. We add tests around the paths that matter before touching versions, so every step is checked.

  • Tests on critical user flows
  • CI that blocks regressions
  • Coverage gaps mapped to risk

Cloud Platform & Runtime Upgrades

Move servers off Amazon Linux 2, runtimes off Node.js 20, and databases onto supported engine versions, testing your app on each new platform first.

  • OS and machine image upgrades
  • Node.js and container base images
  • Amazon RDS engine version upgrades

Database Migration

Move off an old database or engine version with rehearsed migrations and data checks before and after, so you can prove nothing was lost.

  • MySQL or Oracle to PostgreSQL
  • Major engine version upgrades
  • Data integrity validation

Upgrading a Django codebase specifically? See Django Modernization. Changing clouds or leaving a platform? See Cloud Migration & DevOps. Planning AI next? Data stuck behind an unsupported database or old framework is the usual blocker, so modernizing first gives AI Agents in Production something solid to build on.

Cost & speed

Cost and speed review.

An upgrade already touches every layer, so we fix performance and cloud spend in the same pass instead of selling it as a separate project.

Slow Pages and Queries

We profile the slowest endpoints and fix the usual causes: N+1 queries, missing indexes, and work that should be cached.

Core Web Vitals

We measure LCP, INP and CLS on your real pages and fix what drags them down: heavy assets, blocking scripts and slow server responses.

Right-Sizing and Idle Resources

We find oversized instances, forgotten environments, and orphaned volumes and snapshots, then resize or remove them.

LLM and Inference Cost

For teams already running AI features: caching repeated requests, routing simple calls to smaller models, and tracking cost per request.

Included in every Upgrade Assessment, not sold as a separate project.

Upgrade or rebuild

Upgrade, migrate, rescue, or rebuild?

The honest version of the trade-off. Most systems need the smallest change that removes the risk, not a rewrite.

Quick check · 0/3

  1. Do incidents, missing docs or a departed team make any change feel unsafe?
  2. Does the product still fit how the business works?
  3. Does the platform itself have to change, not just its versions?

Answer a question to see which option fits.

What we usually recommend

Upgrade in place

Strong at
Keeps the business logic that already works and removes the support and security risk underneath it.
Watch out for
Needs a test safety net first. Skipping the tests is where most upgrades break.
Pick when
When the product still fits the business but the stack under it is aging.

Phased migration

Strong at
Moves off an aging framework, database or platform in stages, with users served throughout.
Watch out for
Old and new run side by side for a while, which takes careful routing and data sync.
Pick when
When the platform itself has to change, not just its versions.

Rescue first

Strong at
Stabilizes an inherited or failing system before any big decision is made.
Watch out for
It is triage, not the end state. An upgrade or migration usually follows.
Pick when
When incidents, missing docs or a departed team make any change unsafe.

Rebuild

Strong at
A clean foundation when the architecture cannot support where the business is going.
Watch out for
Full rewrites take longer than planned and freeze feature work while they run.
Pick when
Only when repair clearly costs more than replacement and the business case is clear.

How we upgrade

How we upgrade without a rewrite.

The order of work is the safety: tests first, then the upgrade, then a cutover you can roll back.

  1. Audit Versions and Risk

    We check every framework, runtime, package and service against its end-of-life date, and map where the tests are thin.

    Safety net Risks mapped
  2. Tests First

    We add tests around the critical paths and wire them into CI, so each upgrade step is checked before it ships.

    Safety net Tests guard every change
  3. Upgrade in Stages

    We move one version step at a time, fixing deprecations and replacing dead packages, instead of one big-bang jump.

    Safety net Small, reversible steps
  4. Rehearsed Cutover

    We rehearse the data migration and cutover in staging, ship with a tested rollback, and watch production closely afterward.

    Safety net Rehearsed, with a rollback

By the time traffic moves, every step has been tested, staged and rehearsed, and the way back is already proven.

Your first step

Start with an Upgrade Assessment.

A fixed-scope first step that shows what is out of support, what the upgrade will take, and where your cloud bill and slow pages can be fixed, before you commit to the work.

Start here

Upgrade Assessment

A clear picture of what you run, what is past or near end of life, and the safest order to fix it.

  • Version, dependency and end-of-life audit
  • An upgrade path with test gaps and risks called out
  • A cost and speed review of your cloud bill and slowest pages
Talk to an engineer
Written plan and fixed estimate

Upgrade & Cutover

Upgrade in stages behind a test safety net, then switch over with a plan you have already rehearsed.

  • Tests in place before any change
  • Staged upgrade, one version at a time
  • Rehearsed cutover with rollback
Stay current, no cliff edges

Run & Improve

Stay current so you never face a cliff-edge upgrade again.

  • Versions kept current
  • Security patches applied promptly
  • Monitoring, with cloud cost tracked

Stack

Modernization technology stack.

The systems we most often upgrade and migrate, and the tooling we use to keep every step tested.

L3

Frameworks & Runtimes

What your product runs on

  • Django 5.2 LTS
  • Python (supported releases)
  • FastAPI & Celery
  • Node.js for frontends & tooling
L2

Data & Storage

Where it keeps its data

  • PostgreSQL & Amazon RDS
  • MySQL / Oracle to PostgreSQL
  • Redis
  • Elasticsearch
L1

Cloud, CI & Testing

What keeps every step tested

  • AWS / GCP
  • Docker
  • GitHub Actions CI
  • pytest & coverage

FAQ

Frequently asked questions.

Straight answers to what founders and CTOs ask us before an upgrade or migration.

Have a question that isn't here?

Ask it on a free 30-minute call. We reply within one working day.

Ask us →

Legacy modernization is upgrading the frameworks, runtimes, databases and infrastructure under an existing product so it stays supported, secure and fast, without rebuilding it from scratch. In practice that means version upgrades, dependency cleanup, database and platform migrations, and fixing performance and cloud cost along the way, usually in stages so the product keeps running throughout.

Not for long. Django 4.2 LTS stopped receiving security fixes in April 2026 and Python 3.10 reached end of life in October 2026, so any vulnerability found after those dates stays open in your stack. The app keeps running, but the packages you depend on gradually drop support for old releases, which makes every later upgrade harder. Plan the move now: Django 5.2 LTS is supported until April 2028.

Plan the move now. Amazon Linux 2 reached end of support in June 2026, and Amazon RDS for MySQL 8.0 reached the end of standard support in July 2026, after which instances still on it move to paid Extended Support. We upgrade the operating system, machine images and database engine versions in stages, testing your application on the new platform before switching traffic.

It is a fixed-scope first step with three parts. We audit every framework, runtime and dependency against its end-of-life date, lay out an upgrade path that calls out where tests are missing and where the risks sit, and review your cloud bill and slowest pages for cost and speed fixes. You come away with a written plan and a fixed estimate for the upgrade, so you can decide what to do and in what order before committing to the work.

By keeping each change small and reversible. Tests go in first so regressions are caught before release, the upgrade ships in stages rather than as one big switch, and the data migration and cutover are rehearsed in staging with a tested rollback plan. Most steps ship like any normal release. Where a cutover needs a maintenance window, we schedule it for your quietest hours and keep it as short as possible.

Yes. The upgrade already touches every layer, so it is the right moment, and the Upgrade Assessment includes a cost and speed review. We profile slow pages and queries (N+1 queries, missing indexes, missing caching), check Core Web Vitals, and look for oversized or idle cloud resources. For teams already running AI features, we also cut LLM and inference cost with caching and model routing.

Yes, for the mechanical work. AI-assisted tooling speeds up syntax changes, deprecation fixes and first drafts of tests, and an engineer reviews every change. Our engineers own the parts where upgrades actually fail: test coverage, data migration and the cutover itself. AI makes the repetitive work faster; it does not decide what is safe to ship.

It depends on scope: how many versions you are behind, how many third-party packages need replacing, and how much test coverage exists today. A small app one LTS release behind is a very different job from a large codebase several versions back with thin tests. The Upgrade Assessment answers this for your system, and you get a fixed estimate for the upgrade after it.

Yes. You own all source code, tests, infrastructure configuration and documentation we produce. Everything is committed to your repositories as we work, with no lock-in, so you can run, extend or bring the work in-house at any time.

Upgrade before support runs out.

  1. TODAY Send a short message Tell us what you run and where it hurts.
  2. WITHIN ONE WORKING DAY We reply From the engineers you would work with, to set up a free 30-minute call.
  3. ON THE CALL Your first step A fixed-scope sprint or audit. Monthly maintenance after it only if you want it.
Talk to an engineer
Email
hello@micropyramid.com
Offices
Plano --:--Hyderabad --:--Sharjah --:--
You own
All code & IP, from day one

We reply within one working day